Measure the whole workflow before claiming a productivity gain. Include drafting, verification, correction and any rework after delivery. Compare equivalent tasks against a baseline and report the sample rather than assuming a pilot represents everyone. Count important errors separately from minor style changes, and choose an acceptable quality threshold before the test. Faster generation can create more review work. Keep adoption and satisfaction separate from measured accuracy. A useful decision combines total time, error severity and operating costs, with a clear rule for stopping or revising the workflow.
Treat the source card as the evidence for this fictional job. Choose a safe plan, then inspect the scripted reply. Flag only claims that conflict with the stated facts or rules.
Official source, checked November 23, 2026