Separate checks prove separate states. After integration, inspect the combined diff and run the checks affected by the final content. A late merge can drop an export, change an import or combine two individually valid rules into a conflict. Record the revision that produced the evidence. In this lesson you require a final diff read, an affected test command and an exact verified revision in the handoff. The practice session includes unrelated work that should remain intact. Keep verification bounded to the change and the integration contract. Repeating a long suite without a new reason adds delay without explaining whether the combined artifact is correct.
A worked artifact for a separate fictional task. Compare its actions with the contract.