Request
The theater release owner wants the approved build in production with production DATABASE unchanged.
Completion
Preserve slot-specific data settings, retain the old build in staging and identify the live rollout and recovery checks still required.
A fictional theater booking team has approved BUILD=v2 for staging, while production must keep its own database setting. Prepare the hosting plan and secure transport, add staging, and move only the intended configuration into production.
The case includes a recovery question because app configuration is only part of a release. Database changes, real health checks and production traffic remain separate evidence. Keep the old build in staging and choose a completion record that says what the local model verified without claiming that it ran the deployed service.