Request
Wrenfield Dispatch supplies nonnegative job durations and a positive target time. Decide whether both the average-work lower bound and the largest job fit the target.
Result
Return "possible" only when the lower bound fits. This is a necessary feasibility check, not an optimal scheduler or a measured benchmark.
Wrenfield Dispatch needs to choose a worker count for a bounded batch. You will calculate total work, the largest indivisible job and a lower bound on completion time before returning a recommendation. These numbers are fictional planning inputs, not a benchmark of your browser. A perfectly balanced total is impossible when one job is longer than the target, so total work divided by worker count is not the whole answer. The five checked steps preserve the earlier functions and finish with an evidence-based yes or no. Empty work is a valid case. A nonpositive worker count is invalid for planning and uses the sentinel specified in the contract. Explain the lower bound as a feasibility check, not a promised completion time.
Sum every job.