- Site reliability engineer
- Junior
- 30 min
A dispatch deployment capacity change
Scale the named deployment to the requested replicas and confirm all requested replicas are ready. Preserve the unrelated documentation workload. Scope: namespace incident-120, deployment dispatch-120, capacity task target 3 replicas; available image nginx:1.27.
Skills and rubricA dispatch deployment capacity change
- Complete the requested operation, identify the resource and compare its result with one source fact.
- I change the deployment replica target because the controller owns the desired Pod count. I inspect ready replicas as well as the requested number and preserve the unrelated workload. An accepted scale command records intent, while a scheduling or image failure can still prevent the requested capacity from serving.
- I change the deployment replica target because the controller owns the desired Pod count. I inspect ready replicas as well as the requested number and preserve the unrelated workload. An accepted scale command records intent, while a scheduling or image failure can still prevent the requested capacity from serving.