A packaging line needs separate release and reject decisions. Both require material presence and process permission, while quality determines which route is allowed. A bad-pack flag left over between packs must not trigger an empty reject action. Verify exclusivity and empty-line behavior as well as a normal good pack.
Check a good pack and a bad pack while permission is true, then remove the pack while leaving the bad flag set. Both route outputs must turn off. Remove permission on another bad pack too. Those transitions expose an output that ignores presence or an accept route that ignores the quality decision.
Read the tag list and the requested sequence before editing.